EUBCE 2026

Eskom Applies for 2 Nuclear Installation Site Licenses and regulator said in the article the Eskom mentioned its intent to build and operate multiple nuclear reactors

AI Summary

South African utility Eskom submitted two nuclear installation site license applications to the country’s nuclear regulator to build new reactors along the east and west coast.

Eskom was designated an owner and operator by the government, which reportedly plans to issue a request for proposals for 9,600 MW of new nuclear capacity by the end of March. According to Reuters, Eskom applied to potentially build reactors in Thyspunt in the Eastern Cape province and Duynefontein in the Western Cape province, according to Bloomberg. The regulator said in the article the Eskom mentioned its intent to build and operate multiple nuclear reactors.

Despite the country’s intention to build six nuclear reactors, the country is dealing with a period of low growth and facing a ratings downgrade to “junk” status that brings into question how it will pay costs estimated between 400 billion rand ($25 billion) and 1 trillion rand ($63 billion), the article said.

The energy transition is the biggest infrastructure story of this generation. The executives navigating it don’t have time for noise. PowerGen Advancement is where the signal is.

Reaching this audience means being inside the editorial they trust — as the g lobal power sector rewrites itself around new generation, new grids, and new commercial models. Our 2026 Media Pack shows you where to be seen:

Magazine & Digital

Where power sector decision - makers go to separate signal from noise. Your brand should be part of what they find.

Insights & Reports

The analysis the energy industry relies on when the landscape shifts. Being associated with it matters.

Brand Authority

The companies that invest in editorial presence over time don’t need to introduce themselves. They’re already known.

SUBSCRIBE OUR NEWSLETTER

WHITE PAPEERS

RELATED ARTICLES